In Bahrain, breaking the stack is usually done by means of electrical switches, chisels, and also manually.

Demolition of concrete piles is quite challenging because of the reinforcement rods and using conventional methods. The construction industry will not continue until the stacks are open with their reinforcement, which is used in the floats and the Foundation for design.

 

When casting concrete piles, the entrepreneur usually throws stacks greater than the requirement usually piles sticking out of the ground with one or two meters. The presence of labor is the main obstacle when using conventional methods. It is impossible to control the cutting and cracks when you use switches. Fragmentation and flying pieces of concrete due to the impact of breaking the biggest threat to the safety of workers, taking too much time, than expected. All our methods of stack demolition is vibration free and very fast. With our methods for demolition of stack, time customer save 100%.

 

Growing technology stack:

 

A pile of removal is done by drilling holes in the side of the pile of hydraulic splitter in the cut off level with the help of tubing and wedge. There is a large or a small pile of concrete distribution. Excess concrete is removed by lifting crane or excavator in one piece. The system seems to be effective, leaving a good basis for the construction of another without damage of concrete under the cut. The pile is ready as soon as excavation takes place.

 

Pile Breaking and Trimming